Test – Timeline
Presentation
GNRL Corporate Presentation
2001-2003
2006-2007
2008-2009
2009-2010
2013-2014
2015-2021
2022-2023
2001-2003
- PSCs signed in the year 2001 for 6 small development fields in Cambay basin.
- Received ML in 2003 (effective date)
- Tenure of the contract is for 25 years from the effective date
2006-2007
- Drilled 2 appraisal wells in Kanawara field Carried out HF and other stimulation jobs
2008-2009
- Drilled 7 development & exploratory-cum-development wells
- Hydrocarbon Reserves & Resource Estimated & Audited by Gaffney cline associates
2009-2010
- GNRL acquired Heramec Ltd (renamed as GNRL Oil & Gas Limited)
2013-2014
- Drilled 3 vertical wells
- Kanawara field: 1 well
- Dholasan field: 2 wells
2015-2021
- Field development plan (FDP) of Kanawara field approved by DGH.
- Implemented EOR technologies like Thermo-chemical methods in Allora, Dholasan and Kanawara fields
- Acquired Stake of GSPC in 4 fields by exercising ROFOR
2022-2023
- Reservoir monitoring for optimal reservoir recovery based on cased hole formation re-evaluation with Pulsar & SonicScanner logs
- Access the upside HC potential like bypassed oil/low resistivity pays within inventory of existing wells, which can not be identified by conventional logs
- Commenced 1st Phase of development in November 2022.
2001-2003
PSCs signed in the year 2001 for 6 small development fields in Cambay basin.
2001-2003
Received ML in 2003 (effective date)
2001-2003
Tenure of the contract is for 25 years from the effective date
2006-2007
Drilled 2 appraisal wells in Kanawara field Carried out HF and other stimulation jobs
2008-2009
Drilled 7 development & exploratory-cum-development wells
2008-2009
Hydrocarbon Reserves & Resource Estimated & Audited by Gaffney cline associates
2009-2010
GNRL acquired Heramec Ltd (renamed as GNRL Oil & Gas Limited)
2013-2014
Drilled 3 vertical wells
2013-2014
Kanawara field: 1 well
2013-2014
Dholasan field: 2 wells
2015-2021
Field development plan (FDP) of Kanawara field approved by DGH.
2015-2021
Implemented EOR technologies like Thermo-chemical methods in Allora, Dholasan and Kanawara fields
2015-2021
Acquired Stake of GSPC in 4 fields by exercising ROFOR
2022-2023
Reservoir monitoring for optimal reservoir recovery based on cased hole formation re-evaluation with Pulsar & SonicScanner logs
2022-2023
Access the upside HC potential like bypassed oil/low resistivity pays within inventory of existing wells, which can not be identified by conventional logs
2022-2023
Commenced 1st Phase of development in November 2022.